Health and safety regulations and the development of products such as closed panel systems and floor and roof cassettes have improved on-site safety, as well as the speed of assembly time.
Every timber frame installed by Frame UK will have a contracts manager allocated to the job, and each site has an access report carried out prior to the design even starting.
In addition to this, we have two in-house “Appointed Persons” who will create and manage the crane-lift plan and the scaffold plan, prior to any work starting on site.
Our assembly teams are skilled and experienced, and many colleagues have worked with us for years. Each team includes a supervisor, banksmen and slingers, all of whom are highly trained (including in the use of Trad Safety Systems, Rhino Deck, Paslode and Hilti products) and hold CSCS cards.